Gas station project for 500 gas stations per shift (Gazpromneft)

Base price with VAT
Discount price
Price $510.00
Discount
Price $510.00
Index: 31.134.219
Data Sheet: Project documentation including estimates and results of engineering surveys
Sections: all sections
Data volume: 578 MB
File Format: editable formats
Expert opinion: a positive
Technical and economic characteristics of the capital construction object
Land area, ha: 0,5
Building area including, m2: 707,14
building area of ​​the control room building, m2: 213,14
Total area of ​​the control room building, m2: 178,01
Construction volume of the control room building, m3: 830,49
Floors, fl.: 1
Productivity Order/per shift: 500
Estimated cost at the 2001 base price level (without VAT)
Total: thousand rubles: 7229,07
Construction and installation works thousand rubles: 4454,04
Equipment, thousand rubles: 1892,82
Other expenses, thousand rubles: 882,21
including:
PIR thousand rubles: 597,42
refundable amounts, thousand rubles: 16,75
Estimated cost at current price level January 2013 (VAT included)
Total: thousand rubles: 45414,11
Construction and installation works thousand rubles: 33161,99
Equipment, thousand rubles: 8490,52
Other expenses, thousand rubles: 3761,60
including:
PIR, thousand rubles: 2368,05
VAT, thousand rubles: 6927,57
refundable amounts, thousand rubles: 124,73

Description of the capital construction object

The project of a gas station was developed on the basis of a design assignment and an urban planning plan for a land plot. In accordance with the task, it is planned to place a filling station for 500 filling stations in this territory to service vehicles with unleaded gasoline and diesel fuel, as well as trade in related products. There are engineering networks in the building spot. There is no residential development in the gas station area. For a conditional mark of 0,000, the level of the finished floor of buildings, corresponding to the mark of +18,400, is taken. The maximum level of groundwater rise is expected at absolute levels of +17,00-+17,500. The composition of the gas station for refueling six vehicles at the same time includes: the control room building, with a total area of ​​​​the building - 178,01 m2; canopy with organized drainage of rainwater over 3 fuel-dispensing islands (with internal drains and electric heating); fuel dispensers (TRK) - 3 pcs.; underground two-section fuel tanks with a capacity of 50 m3 - 3 pcs. (located next to the AC site); emergency underground tank with a capacity of 15 m3 - 1 pc. (located next to the AC site); fire-fighting water tanks with a capacity of 50 m3 - 2 pcs. platform for a tank truck (ATs ZHMT); garbage collector for collecting household waste; advertising stele and other advertising media, information signs; parking for cars for 4 cars (incl. 1 m/m for the disabled). DSU site. The designed control room building with a store and a cafeteria is a one-story rectangular volume with dimensions in the axes of 17,33x10,61 m and a height of 4,04 m. The main entrance is designed to the trading floor with the installation of a metal-plastic glazed door. The entrance to the building for visitors is designed along a ramp. The lower part of the entrance glazed doors to a height of 0,3 m is protected by a shockproof strip. The project provides for unhindered access for disabled people and people with limited mobility to the gas station building. The building also has 3 service doors on the reverse side of the facade. A separate entrance for maintenance of the electrical room, entrance to the operator's room and the manager's office, a separate door to the corridor, through which the loading of products for the buffet and the store is carried out. The premises of the control room building include: Service room for drivers and passengers with an area of ​​95,0 sq.m; Utility room of a fast food corner with an area of ​​4,24 sq.m; Manager's office with an area of ​​4,62 sq.m; Household premises of operators with an area of ​​10,33 sq.m; Low-temperature chamber with an area of ​​3,22 sq.m; Medium temperature chamber with an area of ​​6,67 sq.m; Premises for receiving, storing and preparing food products for sale with an area of ​​9,14 sq.m; ITAT and ITSO maintenance room with an area of ​​2,28 sq.m; Switchboard with an area of ​​4,72 sq.m; Premises for receiving, storing and preparing non-food products for sale with an area of ​​8,93 sq.m; A room for household inventory and PPSh, a water meter unit with an area of ​​4,66 sq.m; Bathroom with a shower area of ​​1,55 sq.m; Amenity premises for tankers with an area of ​​6,38 sq.m; Bathroom for staff with an area of ​​1,04 sq.m; Vestibule of bathrooms with an area of ​​2,72 sq.m; Bathroom for visitors and MGN with an area of ​​3,57 sq.m; Bathroom for visitors with an area of ​​1,04 sq.m; Room for cleaning equipment with an area of ​​2,38 sq.m; Corridor with an area of ​​5,52 sq.m. The total area of ​​the control room premises is 178,01 sq.m. The height of the suspended ceiling made of metal tiles 600x600 in the sales area is 3,0 m. The ceiling height of the utility rooms is 2,5 m. Medium-temperature and low-temperature chambers - without false ceilings, room height - 3,2 m. The buildings of the facility are equipped with a fire warning system for people in accordance with the requirements of NBP 104-03. The filling of openings in fire barriers is made of non-combustible materials. The fire resistance limit of the fire barrier in the control room is REI 45, the filling of openings type 2, the fire resistance limit is EI30. Installed fire doors have a fire resistance rating of EI30 and are equipped with door closers. Fire doors have a latch lock. The roof of the control room building is flat, not in use, made of roofing panels of the "sandwich" type, CSP sheets 2 layers - 20 mm, rolled roofing material "Uniflex" KhPP - 2,8 mm, "Technoelast "Flame-Stop" EKP - 4,2 mm. Drainage from the roof of the control room building is external organized along the drainage tray with the help of two drain funnels. The canopy over the platform of filling islands over three fuel dispensers is a “T”-shaped structure in plan with overall dimensions of 8,00 x 22,00 m and 8,0 m x 13,90 m, height to the top of building structures 5,30 m. The roof of the canopy is flat, not in use, is made of galvanized profiled sheet grade H 75-750-0,8 according to GOST 24045-2010 according to steel purlins according to GOST 8240-89. Drainage from the roof is organized through downpipes passing through the lining of the columns.

Structural scheme, maximum permissible parameters

The control room building is designed according to a frame structural scheme, with rigid junctions of columns with foundations and hinged junctions of beams with columns. The columns are made of steel profile pipes according to GOST 30245-2004, the beams are made of I-beams according to STO ASCHM 20-93. The foundations for the control room building are taken in the form of a monolithic reinforced concrete slab 300 mm thick on an elastic foundation. The base of the foundation is compacted bulk soils (EGE 1). The foundations are made of concrete of compressive strength class B25, grades W6 for water resistance and F150 for frost resistance. The thickness of the protective layer of concrete for the bottom reinforcement of the foundations is assumed to be 40 mm, the top - 20 mm. Under the slab, a preparation of class B7,5 concrete with a thickness of 100 mm is arranged. The frame of the canopy is designed according to the frame structural scheme, with rigid junctions of columns with foundations and articulated junctions of beams with columns. The columns are made of steel profile pipes according to GOST 30245-2004, the beams are made of I-beams according to STO ASCHM 20-93. The canopy columns rest on underground metal frames embedded in the reinforced concrete slabs of the fuel tanks foundations. A 400 mm thick slab is made of concrete of compressive strength class B25, grades W6 for water resistance and F75 for frost resistance. The base of the slab is silty, soft-plastic loam (EGE 3), reinforced on top with a sand cushion 200 mm thick, compaction coefficient Ku = 0,95. The thickness of the concrete protective layer is assumed to be 40 mm. Under the slab, a concrete preparation is made of B7,5 concrete with a thickness of 100 mm.

Facades

The outer walls of the gas station building are designed in a metal frame with enclosing wall structures made of three-layer metal "sandwich panels". The facade of the building is lined with decorative square panels of dark blue color in combination with brown panels made of non-combustible polymer-coated aluminum (GOST R 52146-2003 p. 9.1) in accordance with the requirements of the catalog of industrial standards of the filling station network. Along the perimeter of the building, a blind area is made of gray paving slabs on a sand and gravel base. At the entrance to the control room for clients there is a sliding door with hinged doors (as part of a stained-glass window made of white PVC profile), a “bath” 1,0 x 0,5 x 0,03 m (h) with a grate is installed in front of the entrance. Glazing of doors with anti-shock film of class A3. A button is installed for emergency opening of the doors. A hinged glass door for an emergency exit is installed next to the entrance to the control room. Evacuation exits are provided according to the norms. The external doors of the utility rooms are deaf, metal on a metal frame, insulated with porch seals. Doors are equipped with closers. The building has the following types of windows: front stained-glass window with a size of 12870 x 3000 mm - with a transparent two-chamber double-glazed window, aluminum with an anti-shock film of class A3. Class according to the reduced resistance to heat transfer B2; Windows sized 400 x 1000mm are hinged with transparent double-glazed windows, aluminum with anti-shock film class A3. Class according to the reduced resistance to heat transfer B2; window size 1000 x 1200 mm tilt-and-turn with a transparent two-chamber double-glazed window, aluminum with anti-shock film class A3. Class according to the reduced resistance to heat transfer B2. The cover of the canopy is designed from steel galvanized profiled flooring H75-750-0,8 in accordance with GOST 24045-94 for metal girders. Fastening sheets of corrugated board to the purlins is provided by self-tapping bolts M6-8dx 20.56.099 according to OST 34-13-016-77 on all supports in each wave. Between themselves, the sheets are connected with combined rivets 3K 12x4.5 according to TU 36-2088-85 through 300mm. The exterior design of the canopy includes advertising structures with LED backlighting elements with single-crystal blue light-emitting diodes in accordance with the requirements of the catalog of industrial standards of the gas station network. Finishing facilities. For interior decoration of premises, materials are used that are approved by the bodies and institutions of the State Sanitary and Epidemiological Service in the prescribed manner. Materials for finishing are accepted according to the list of finishing of premises (sheet 3 of section 68-12-AP).