Typical project of a kindergarten 214-1-117

https://proekt.sx

Online store for reuse projects

Cart is empty

Did not you find what you were looking for? Ask us! We have archives of 140 TB. We have all modern reuse projects and renovation projects for Soviet standard buildings. Write to us: info@proekt.sx


Project 214-1-117

Base price with VAT
Discount price
Price $980.00
Discount
Price $980.00
Index: 16022201
Data Sheet: Working documentation including estimates
Sections: All sections
Data volume: 240 MB
File Format: *.dwg, *.doc, *.pdf
Working documentation including estimates for a comprehensive overhaul of a kindergarten standard project 214-1-117
Technical and economic indicators.
Construction class -II.
The degree of fire resistance of the building is II.
Functional fire hazard class of the building F 1.1.
Total area: 2788,33 m2
Usable area: 503,59 m2
Basement area: 1055,2 m2
Ground floor area: 865,8 m3
Second floor area: 867,33 m3
Basement floor height: 2,0 m
Ground floor height: 3,00 m
Second floor height: 3,00 m
Building area: 1078,6 m3
Construction volume: 9114,2 m3

General information.

The building of the kindergarten was made according to the standard project 214-1-117. Breakdown of the territory of the preschool educational institution into functional zones: zone of the playing territory; the economic zone, the zone of the playing territory includes: two sports grounds with an area of ​​150 and 250 m2 and eleven group grounds, individual for each children's group, equipped with shady canopies with an area of ​​40 m2. Group playgrounds are designed on the basis of: 9 m2 for 1 preschool child and 7,2 m2 for 1 toddler. They are connected by a path 1,5 m wide around the perimeter of the site, designed for children to ride a bicycle. The economic zone consists of a turning area in front of the loading area of ​​the catering unit and a container area for collecting garbage. It is isolated from the rest of the territory by green spaces. Containers are placed at a distance of 25 m from the PEI building. An independent entrance is organized to the economic zone from the intra-quarter passage on the northern side of the site. For the entrance of the fire engine to the building, a one-way ring passage was designed. Approaches to the building and sites are designed taking into account the convenience for pedestrians. The project provides for a green protective strip 2 m wide along the perimeter of the site, as well as protective strips that provide sanitary breaks between the sites: 3 m between group sites, between group and sports grounds; 6 m. between the group and economic sites. The following design solutions were adopted in the project: Bearing walls of the building: below the mark of 0,000: foundation blocks 400, 500 mm. Above 0,000: effective ceramic brick 380, 510 mm; Ceilings and coverings are prefabricated reinforced concrete. plates - 220 mm; External walls: below 0,000 mark: three-layer - foundation blocks 400, 500 mm. Above 0,000: three-layer - effective ceramic brick 380, 510 mm, insulation "ISVER OL-E" 50 mm. from the inside, sheathed with plasterboard; Partitions: plaster blocks - 80 mm, brick - 125 mm existing; window blocks made of polyvinyl chloride profiles, with double-glazed windows; doors - wooden according to GOST 6629-88, 24698-81 and metal special order; window sills - PVC, 30 mm thick; a flat roof with internal drains. Coating - built-up bitumen polymer material two layers. Flights of stairs are monolithic reinforced concrete.

Authorization