Project of an energy center based on 15 MW gas piston units

Base price with VAT
Discount price
Price $3,400.00
Discount
Price $3,400.00
Index: 11092300
Data Sheet: Design documentation including estimates and engineering survey results
Sections: all sections
Data volume: 652 MB
File Format: *.pdf, *.xlsx
Expert opinion: a positive
Project documentation including estimates and results of engineering surveys for the construction of an energy center based on 15 MW gas piston units
Technical and economic indicators within the boundaries of stage I design work:
Area of ​​the site within the boundaries of the work - 11938,00 m2
The construction area within the boundaries of the work is 265,00 m2
Development rate within the work boundaries – 2.2%
Area of ​​platforms and passages – 1443,00 m2
- covering from road slabs PAG-14 (type 1) – 578,00 m2
- covering the service area from road slabs
monolithic concrete sections (type2) - 865,00 m2
Lawn area within the work boundaries – 10230,00 m2
The coefficient of greening within the boundaries of the work is 85,6%
Technical and economic indicators within the boundaries of stage II design work:
Area of ​​the site within the boundaries of the work - 142,00 m2
The construction area within the boundaries of the work is 53,00 m2
Development rate within the work boundaries – 37.7%
Area of ​​platforms and passages – 80,00 m2
- covering the service area from road slabs
monolithic concrete sections (type2) - 80,00 m2
Lawn area within the work boundaries – 9,00 m2
The coefficient of greening within the boundaries of the work is 6,3%

General information.

This working documentation provides for the design of an energy center based on gas piston units (hereinafter referred to as EC, energy center), intended to provide electrical and thermal energy and cold to consumers. The main equipment installed in the energy center (EC): three block-modular gas piston units (GPU) manufactured by Jenbacher, with an electrical power of 5000 kW each, with an output voltage of 10 kV, with a heat recovery system (HRU) with an electrical efficiency of 41,3%, certified, fully factory ready. - block-modular indoor switchgear 10 kV, with an auxiliary transformer with a capacity of 630 kVA, and switchgear 0,4 kV, certified, fully factory ready. - absorption refrigeration machine (ABRM), with a capacity of 1 MW of cold, certified, fully factory-ready, producing coolant with parameters +5/ +15C. The installed electrical capacity of the main equipment of the electrical center is 15000 kW.

Authorization