Project of cable lines 35 kV

https://proekt.sx

Online store for reuse projects

Cart is empty

Did not you find what you were looking for? Ask us! We have archives of 140 TB. We have all modern reuse projects and renovation projects for Soviet standard buildings. Write to us: info@proekt.sx


Project of cable lines 35 kV

Base price with VAT
Discount price
Price $194.00
Discount
Price $194.00
Index: 46.127.251
Sections: all sections
Data Sheet: Project documentation without estimates and results of engineering surveys
Data volume: 1285 MB
File Format: editable formats
Expert opinion: a positive
Design documentation, without estimates, and the results of engineering surveys for the construction of a new 35 kV cable line PS86-PS21 to replace the 35 kV cable line KYu-1, KYu-2, KYU-3
Technical and economic characteristics of the capital construction object
Network length, m: 6700,0

Organization of construction

The construction organization project provides for the laying of a 35 kV cable line. The construction master plan was developed on a scale of 1:500 for the construction period, taking into account the work of the preparatory period. Temporary solid fencing of the construction site is provided in accordance with the requirement of GOST 23407-78. The entry and exit of transport and construction equipment to the construction site is organized from the side of the road network. At the exit from the construction site, it is planned to wash the wheels of vehicles with circulating water supply. The laying of the cable line is carried out in open and closed ways. Earthworks for the construction of pits and trenches are carried out with an EO-3323A type excavator with a 0,65 m3 bucket and a Vermeer Navigator D20x22A installation. The mechanization of construction works is complex, using mechanisms such as: EO-3323A, Vermeer Navigator D20x22A, KS-35715, ASF-K-2-07, DM-64. Work will be carried out in 2 shifts.
Materials are stored in open warehouses with a margin of no more than 5 days. Provision of construction materials is provided from the enterprises of the construction industry. Amenity premises for construction workers, with a maximum number of employees of 24 people, are provided in mobile change houses. The total duration of construction, taking into account the work of the preparatory period, is 4 months. Construction waste generated during construction is removed by a specialized organization to a licensed solid waste landfill. The requirements for the organization of the construction site, labor protection and hygiene of construction work, methods of construction work, methods of instrumental control over the quality of construction, labor safety measures, and environmental conditions are met in the project in full. The use of materials and mechanization specified in the project is justified by calculations and conditions for the production of work.

Engineering equipment, utility networks, engineering activities

Laying a cable line 35 kV.
Assignment for the development of design documentation "construction of a new cable line 35 kV Substation No. 86 - Substation No. 21 to replace the cable lines 35 kV KU-1, KU-2, KU-3" issued by the branch "*****" and TU. The project documentation provides for the laying of the 1st cable line 35 kV ~ 6,700 m long (including 12 HDD crossings, with a total length of 0,607 km), grade PvP2g-1 x 800 (gzh) / 70 (s). Between section 1 "RPP-86" and section 1 "RPP-21". Estimated line current 640 A. The cable line runs from Substation No. 86 along the street. ***** - in an open way, then in the lawn along ***** highway on the odd side - a closed crossing by the HDD method through ***** highway to lawn median - closed crossing by HDD roadway ***** highway near d.16 - in the lawn on the even side ***** highway, closed crossing ***** highway, then in the sidewalk - a closed crossing using the HDD method of the carriageway ***** highway, at the entrance to the city - in an open way in the carriageway of Zosimova st. - in an open way in the carriageway of st. *****, closed transition by HDD method pr. *****, st. *****, sq. *****, st. ***** - in an open way in the carriageway of the street. *****, closed crossing by HDD method st. *****, st. ***** – open way in the roadway ***** st. before ***** canal - a closed crossing, by the HDD method of the Obvodny Canal, in the carriageway ***** st., then in an open way in the sidewalk ***** st. on the odd side - in an open way in the sidewalk ***** st. on the odd side - in an open way in the sidewalk ***** st. to PS No. 21. Sections "Relay protection" and "Telemechanics and communications" in accordance with the letter will be developed in a separate project.

Improvement

Design documentation for the construction of a new 35 kV CL-86 kV SS21-PS35 to replace 1 kV CL-2, KYU-3, KYu-XNUMX in the city of *****, st. *****, 10 (PS-21) on the street. *****, st. *****, st. *****, st. *****, st. *****, ***** highway, st. ***** to PS86 "Damba-2" was developed in accordance with the design assignment. The area under consideration is located in ***** area of *****. The territory is landscaped. After laying the cable line, the design documentation provides for the restoration of the asphalt concrete pavement in the existing structure: roadway st. ***** – 1394 m2, construction: fine-grained dense asphalt concrete type B grade I GOST 9128-2009 - 5 cm; coarse-grained dense asphalt concrete grade III GOST 9128-2009 – 4 cm; porous asphalt concrete GOST 9128-2009 - 6 cm; crushed granite grade 1000 fraction 40 - 70 mm GOST 8267-93 - 25 cm; fine sand GOST 8736-93 * - 50 cm; roadway st. ***** from st. ***** to ***** st. area - 327 m2, construction: fine-grained dense asphalt concrete type B grade I GOST 9128-2009 - 4 cm; porous asphalt concrete GOST 9128-2009 - 6 cm; crushed granite grade 1000 fraction 40 - 70 mm GOST 8267-93 - 30 cm; fine sand GOST 8736-93 * - 8 cm; roadway st. ***** from st. ***** to ***** st. area - 237 m2, construction: fine-grained dense asphalt concrete type B grade I GOST 9128-2009 - 4 cm; porous asphalt concrete GOST 9128-2009 - 6 cm; crushed granite grade 1000 fraction 40 - 70 mm GOST 8267-93 - 25 cm; fine sand GOST 8736-93 * - 50 cm; carriageway ***** highway area - 377 m2, construction: fine-grained dense asphalt concrete type B grade I GOST 9128-2009 - 4 cm; coarse-grained dense asphalt concrete grade III GOST 9128-2009 – 8 cm; crushed granite grade 1000 fraction 40 - 70 mm GOST 8267-93 - 22 cm; fine sand GOST 8736-93 * - 30 cm; roadway st. ***** area - 534 m2, construction: fine-grained dense asphalt concrete type B grade I GOST 9128-2009 - 4 cm; porous asphalt concrete GOST 9128-2009 - 6 cm; crushed granite grade 1000 fraction 40 - 70 mm GOST 8267-93 - 22 cm; fine sand GOST 8736-93 * - 30 cm; roadway st. ***** area - 67 m2, construction: fine-grained dense asphalt concrete type B grade I GOST 9128-2009 - 4 cm; porous asphalt concrete GOST 9128-2009 - 6 cm; coarse-grained dense asphalt concrete grade III GOST 9128-2009 – 4 cm; porous asphalt concrete GOST 9128-2009 - 6 cm; crushed granite grade 1000 fraction 40 - 70 mm GOST 8267-93 - 15 cm; fine sand GOST 8736-93 * - 8 cm; gravel road area - 600 m2, construction: crushed stone brand 800 fr. 20-40 mm GOST 8267-93 - 25 cm; sand of the 1st class GOST 8736-93 * - 13 cm; demolition and restoration of lawns - 4781 m2, with the introduction of a vegetative layer of earth 0,10 m; transplanting bushes - 1250 pcs.

Authorization