Project for major repairs of a communication center building, standard project VII-050-3

https://proekt.sx

Online store for reuse projects

Cart is empty

Did not you find what you were looking for? Ask us! We have archives of 140 TB. We have all modern reuse projects and renovation projects for Soviet standard buildings. Write to us: info@proekt.sx


Communication center standard design VII-050-3

Base price with VAT
Discount price
Price $2,000.00
Discount
Price $2,000.00
Index: 12062300
Data Sheet: Design, working documentation including estimates
Sections: all sections
Data volume: 680 MB
File Format: * .pdf
Design and working documentation including estimates for a comprehensive overhaul of a communication center, standard project VII-050-3
Technical and economic indicators.
The object of major repairs is a non-residential building of a postal service center with a total area of ​​2407,7 m2
Climatic region - I, subdistrict Iв
The standard value of wind pressure is 38 kg/m² (III Wind Region)
Standard weight of snow cover - 120kg/m²
Estimated winter temperature - (-29° C)

General information.

Design and working documentation for the overhaul of non-residential premises of the post office was developed in accordance with design standards. The purpose of the overhaul is to change the internal space of the premises in accordance with the requirements for the operation of post offices. The project is designed for work at positive temperatures. Work should be carried out in accordance with SP 70.13330.2012. When carrying out work in winter, take into account the corresponding section of SP 70.13330.2012. The conventional mark of 0.000 is taken to be the mark of the clean floor in the client room, see. sheet 2. List of types of work for which it is necessary to draw up inspection reports for hidden work: installation of foundations for floors; priming and antiseptic; arrangement of partition frames; installation of suspended ceiling frames; sound insulation, waterproofing device; installation of jumpers in openings (cash register room); plastering, leveling walls. Measures to ensure noise protection: All doors are equipped with seals in the recesses. All windows are equipped with double-chamber double-glazed windows with a glass thickness of at least 4 mm, seals and a locking device that ensures tight closure of the window sashes. During construction, only non-flammable (NG) and low-flammable (G1) materials with appropriate certificates are used. Fire safety measures during construction work: The conditions for the safe evacuation of people from the building must not be violated. The composition and dilution of varnishes and paints must be done in isolated rooms, in the areas where existing exhaust systems are located. Paints and solvents spilled on the floor should be immediately cleaned up using sawdust, water, etc. Washing floors, walls and equipment with flammable solvents is prohibited. For all types of hot work, it is necessary to issue a work permit in order to prevent the contact of hot metal particles with other materials and the products are covered with non-flammable materials, and the places where hot work is carried out must be cleared of flammable substances and materials. After completion of the work, the electric lighting must be turned off and the electrical network de-energized; it is necessary to appoint someone responsible for the fire safety condition of the facility. Combustible waste and construction debris should be collected in special containers and removed regularly. The construction site must be equipped with fire extinguishing equipment. Smoking is permitted only in specially designated and equipped areas. The person responsible for the fire safety condition of the facility is required to provide daily instructions and reflect this in the logbook. Storage of finishing and consumable materials should be in specially designated areas. When working with electrical wiring, the electrical network must be de-energized. Connecting the power tool must comply with the requirements of the operating rules for electrical installations. Every employee who detects a fire is required to notify the city fire department by phone.