Standard project 164-80-2

https://proekt.sx

Online store for reuse projects

Cart is empty

Did not you find what you were looking for? Ask us! We have archives of 140 TB. We have all modern reuse projects and renovation projects for Soviet standard buildings. Write to us: info@proekt.sx


Standard project 164-80-2

Base price with VAT
Discount price
Price $1,500.00
Discount
Price $1,500.00
Index: 11212300
Data Sheet: Working documentation including estimates
Data volume: 630 MB
Sections: All sections
File Format: *.pdf, *.xlsx
Expert opinion: a positive
Working documentation including estimates for the overhaul of the hostel building standard design 164-80-2
Technical and economic indicators.
Total area of ​​premises before renovation, m2: 3203,44
including: basement floor, m2: 80,65
1-5 floors, m2: 2553,32
attic, m2: 569,47
Building area, m2: 756,7
Construction volume, m3: 9394,0

General information.

The level of the finished floor of the first floor is taken as the relative level of 0,000. The building has a complex shape in plan with dimensions in axes 1-8/A-E: 30,16 x 19,44 (m), five-story with an attic and underground. According to the structural design, the building is frameless, with load-bearing internal and external walls made of stone materials, with a prefabricated reinforced concrete floor. The spatial rigidity of the building is ensured by the rigidity of the internal and external walls, as well as the work of the hard drives of the interfloor floors, and the spatial work of the roof trusses. To protect the foundation from surface water, a sidewalk with asphalt concrete coating is provided (in this case, the sidewalk replaces the blind area). The floors are made of prefabricated hollow-core slabs in accordance with GOST 9561-91. The roof is an attic, complex. The covering is a galvanized sheet, b=0,7 mm, the connection of the sheets is seam. The building in plan has a complex shape with dimensions in axes 1-8 - 30,16 m, A-E - 19,55 m, five-story with a basement, attic and combined roof. The height of the floors of the building is 2,85 m, in the light - 2,55 m, the basement is multi-level in height, the height of the attic is 1,75 m. The basement is provided for the placement of utilities. In the basement there are: a supply ventilation chamber, a heating unit, a water metering unit, and also the main lines of all major engineering systems: heating, ventilation, sewerage, water supply, electricity supply.

Authorization