Did not you find what you were looking for? Ask us! We have archives of 140 TB. We have all modern reuse projects and renovation projects for Soviet standard buildings. Write to us: info@proekt.sx
II-49-04/Y variant D
Common data.
The 9-storey building with a technical underground under the entire building was built in 1971 according to the standard project II-49-04/Y Option "D". External walls - reinforced concrete three-layer panels. Internal supports - walls made of prefabricated reinforced concrete panels. Ceilings - prefabricated reinforced concrete panels "per room" in size. Stairs - two-flight, made of prefabricated reinforced concrete marches and prefabricated reinforced concrete ribbed platforms. The roof is non-attic, combined, ventilated, with an internal organized drain. Roof covering - a rolled carpet is made of 2 layers of hydrostekloizol on bituminous mastic. Windows - wooden, double-glazed windows, blocks of PVC profiles with double-glazed windows. Facades - lined with ceramic tiles (the outer textured layer of wall panels), the plinth is plastered and painted.