vocational school project

Base price with VAT
Discount price
Price $350.00
Discount
Price $350.00
Index: 87.127.243
Data Sheet: Design, working documentation including estimates and results of engineering surveys
Sections: all sections
Data volume: 178 MB
File Format: editable formats
Expert opinion: a positive
Technical, economic and cost indicators
Plot area, ha: 1,4942
Built-up area of ​​the building, m2: 2977,3
Total building area, m2: 6289,3
Construction volume of the building, m3: 32289,9
Estimated cost at the 2001 base price level (without VAT)
Total: thousand rubles: 46218,60
Construction and installation works, thousand rubles: 39245,41
Equipment, thousand rubles: 364,24
Other expenses, thousand rubles: 6608,95
including:
PIR, thousand rubles: 5040,16
refundable amounts, thousand rubles: 67,60
Estimated cost at the current price level as of July 2009 (including VAT)
Total: thousand rubles: 249202,87
Construction and installation works, thousand rubles: 225016,35
Equipment, thousand rubles: 2248,32
Other expenses, thousand rubles: 21938,20
including:
PIR, thousand rubles: 12715,89
VAT, thousand rubles: 37943,50
refundable amounts, thousand rubles: 387,62

When developing the reconstruction and overhaul project, the data of the design documentation for the building of the vocational school, issued by GIPROGEOSTROY Ukrainian branch of GIPROGEOSTROY, Poltava in 1976, were used.

Totals

The project of reconstruction and overhaul of the building of the former vocational school into an administrative building. The site where the reconstructed building is located (a former vocational school for 600 students) is located on the western outskirts of the district. On the site, in addition to the indicated building, there is a garage. On the northern side, wetlands free from buildings adjoin the site, on the east - low-rise residential buildings (garden plots), on the south and east - single residential buildings (hostel buildings). The relief of the site is flat, the territory is landscaped, paved, there are green spaces and lawns. The reconstructed object was built in the 70s of the XX century and is a complex building, consisting of three buildings of different heights, interconnected into a single complex. Building 1 is a two-story building, consisting of two blocks: a two-story one with a maximum plan size of 12,88 x 42.68 and floor heights of 3.450 and 3.0 m and a two-story single-story unit with dimensions of 24.44 x 24.88 and a height to the bottom of the floor slabs - 6.200 m. Building height 1 - 8.02 m (parapet mark - 7.400 m). Building 2 is a three-story building with plan dimensions of 17.32 x 67.34 m, with floor heights of 4.35, 4,50 and 3,00 m. Building 3 is a four-story building with plan dimensions of 16.28 x 30.73 m and floor heights of 3.0 m. The height of the parapets of buildings 2 and 3 - 14.0 m. The existing structural scheme of the buildings is an incomplete internal reinforced concrete frame with load-bearing outer walls made of bricks 640 mm thick with a span of 6,0 + 6,0 m for building 1, a span of 6,0 + 3,4 + 6,0 for buildings 2 and 3. Slabs floors - reinforced concrete, 220 mm thick. The floor slabs above the halls (gym and assembly hall) in building 1 are reinforced concrete ribbed, with a span of 12,0 m. The building has a basement and an upper technical floor located in the central part of buildings 2 and 3 along their entire length. The roof is rolled, the drain is external, unorganized. The building has three internal staircases (prefabricated reinforced concrete marches with landings) and two external metal evacuation staircases (building 1).

The main space-planning and technological solutions

The project for the reconstruction and overhaul of the building provides for the internal redevelopment of the building (with full preservation of the structural scheme) in order to organize an educational base, as well as comply with the requirements of modern sanitary and fire safety standards. The main entrance to the building is provided in building 1 from the western facade at the site of the existing entrance, while the one-story brick extension, made by the household method, is demolished and an entrance vestibule is made in place of the existing porch, taken out of the total volume of the building. The project also provides for the punching of two additional entrances (with the existing staircase in building 2 and with the projected staircase in building 3). The total number of people in the building - 270 people. The number of working days in a year is 365 days. Number of shifts per day - 3. Duration of duty - 8 hours. The mode of study in classrooms and gyms is from 8.00 to 17.00. The canteen is open from 07.00:19.00 to 11:1,5. The number of personnel of the canteen is XNUMX people, the mode of operation is XNUMX shifts. Building No. 1 On the first floor there is: Entrance hall with security rooms and outerwear wardrobe (121,8 + 8,2 + 9,2 + 15,3 m2), service rooms and inventory room; projected vestibule of the main entrance, taken out of the total volume of the building to the site of the existing porch (7,5 m2); assembly hall for 160 seats with a stage and props (225.2 + 13,0 m2); gym 12,0 x 24,0 m with an inventory room, locker rooms, bathrooms, showers and a coaching room (271,2 + 10,3 + 13,8 + 7,8 +17,6 m2). The gym provides for a rehabilitation complex with a sauna, a wardrobe, a locker room, a shower room, a font and a relaxation room (with a total area of ​​47,3 m2). On the side of the eastern facade of building 1, along axis 18, loading rooms for a canteen with a storekeeper's room, a waste storage room (22,6 + 6,5 + 7,3 m2) and a ventilation chamber (22,9 m2) are provided (in place of the existing ones). On the second floor there is: dining room for 60 seats with distribution (170,2 m2);  production, auxiliary and administrative premises of the canteen, see the section "Technology of public catering"; ventilation chamber, film projection (existing) with an area of ​​19,1 +29,1 m2. Building No. 2 On the first floor there is: 2 shooting galleries with shooting distances of 25 and 50 m (313,2 + 210,5 m2), planned to be isolated from other rooms located on the floor; For space-planning solutions for shooting galleries, see the "Technical Strengthening of the Object" section. 2 gyms (a wrestling and boxing hall with a capacity of 14 people and a gym with a capacity of 6 people) with an area of ​​115,4 and 30,2 m2, inventory (9,8 m2); men's and women's locker room with showers and toilets (17,6 + 9,9 + 6,3 + 5,0 + 2,5 + 3,1 m2). On the second floor there is: premises for OMON officers (2 squads x 6 platoons = 12 rooms with an area of ​​17,3 m2) and 6 rooms for squad commanders of 15,5 m2 each, a room for foremen (13,2 m2); recreation room (billiard room / table tennis) with an area of ​​50,6 m2; class of service (32,7 m2); men's and women's household premises with showers and toilets (total area 82,6 m2); an armory with a room for loading and unloading weapons and security rooms (27,7 + 16,7 + 8,9 + 8,5 m2); a battalion commander's office with a rest room (22,0 + 29,6 + 5,4 m2) and headquarters offices (5 rooms 18,1 + 16.6 + 18,5 + 23,7 + 23,4 m2). On the third floor are located: 5 classrooms (51,2 + 52,0 + 52,0 + 52,0 + 51,2 m2) with 5 teaching rooms (each with an area of ​​16.1 m2); room for psychological relief with a psychologist's office (50,0 + 19,4 m2); rest room, office space (58,4 + 38,4 m2); OMON command room (72,5 m2) utility rooms (18,3 + 18,3 m2); smoking room, male and female bathrooms (17,2 + 15,4 + 8.4 m2). Building No. 3 On the first floor there is: 2 superior offices, one of which has a separate entrance and an existing planning structure (the total area of ​​offices is 60,6 and 68,8 m2), administrative premises (17,2 m2); built-in internal staircase with a new entrance to the building and a porch; duty room, located next to the projected entrance (11,0 m2); 4 rest rooms for OMON officers at the rate of at least 6,0 m2 per person (13,0 + 18,0 + 19,7 + 21,5 m2) with bathrooms and showers; laundry room with pantries for clean and dirty linen, utility room (12,5 + 7,4 + 5,0 + 9,4 m2); Switchboard (15,0 m2). On the second, third and fourth floors of building 3 there are rest rooms for OMON officers (32 people on each floor), bathrooms, showers, eating rooms, laundry rooms. Ventilation chambers are located on the upper technical floor. Also, the project of reconstruction and overhaul is carried out: dismantling of the landing at elev. +9.750 in building 2 with marches adjacent to it with the construction of new marches and a platform to ensure the standard height of evacuation routes;  replacement of the existing roof covering (waterproof carpet and insulation) of the entire building with the installation of an external organized drain; waterproofing walls and bottom of the basement; full or partial laying of gates and doors with bricks, punching new window and door openings in the main walls, replacing existing wooden windows and stained-glass windows with metal-plastic ones.

Constructive decisions

The administrative building was built in 1980. The building is located near a reservoir and, due to the constant washing away by groundwater, the physical and mechanical characteristics of the soils of the base of the foundations have deteriorated and the basement has been flooded. The project provides recommendations for strengthening the foundation soils by grouting and waterproofing the basement. These works should be carried out by a specialized organization after the development of a project for the production of works. In the project, a staircase was reconstructed between axes 1-2, a new staircase was designed along the F axis between axes 19-20, under the bearing wall of which a monolithic reinforced concrete strip foundation was designed. Stringers of flights of stairs and beams for monolithic reinforced concrete transitional platforms - metal, steps - prefabricated reinforced concrete. In the existing brick wall along axis 7 between the axes M-P, an opening was made with reinforcement by metal structures. The existing dilapidated porches to the building were dismantled and new reinforced concrete porches with canopies over the entrances were designed. Visors are made of profiled sheet on metal beams. The calculation of steel structures was carried out in accordance with the instructions of SNiP II-23-81*. The calculation of monolithic reinforced concrete structures was performed in accordance with the requirements of SNiP 2.03.01-84*, SNiP 2.02.01-83 and TSN 50-302-2004. The production and acceptance of all work during the reconstruction and overhaul of the administrative building shall be carried out with the execution in the prescribed manner of acts of examination of hidden works in accordance with the requirements of SNiP 3.03.01-87. The working documentation of the KM brand for the reconstruction and overhaul of the administrative building was made on the basis of an agreement with the customer and in accordance with the architectural and construction drawings. Regulatory wind and snow loads are taken, respectively, 30 kgf/m2 (III region, amend. No. 2) according to SNiP 2.01.07-85). The calculated winter temperature of the outside air of the coldest five-day period was taken to be minus 260C in accordance with SNiP 23-01-99. The building is heated. Year of construction 1980 The structure belongs to the I class of responsibility of buildings and structures. When calculating structures, the reliability factor for the purpose γn= 1 is taken into account. The calculation of steel structures was carried out in accordance with the instructions of SNiP II-23-81*. Manufacture, acceptance and installation of structures shall be carried out in accordance with the requirements of SNiP III-18-75 and SNiP 3.03.01-87. Factory connections are welded, assembly on bolts of normal accuracy of strength class 5.6 and assembly welding. Welding should be carried out with E42 electrodes in accordance with GOST 9467-75*. Anti-corrosion protection of steel structures should be painted in two layers with PF-115 enamel, GOST 6465-75, over a primer layer GF-021, GOST 25129-82. Protection of assembly welded and bolted joints should be carried out with three layers of the same enamel over the primer layer GF-021. Before applying protective coatings, the surfaces of structures must be cleaned to degree 3 in accordance with the requirements of SNiP 2.03.11-85 and GOST 9.402-80.