Kindergarten project for 130 places

Base price with VAT
Discount price
Price $1,000.00
Discount
Price $1,000.00
Index: 93.189.214
Data Sheet: Design, working documentation including estimates and results of engineering surveys
Sections: All sections
Data volume: 1204 MB
File Format: editable formats
Expert opinion: a positive
Construction of a preschool educational institution for 130 children with a swimming pool.
Technical and economic indicators
Land area, ha: 0,4860
Building area, m2: 1413,34
Total building area, m2: 4247,68
Construction volume in total, including: m3: 17353,95
above el. 0,000, m3: 13894,39
below el. 0,000, m3: 3459,56
Floors, fl.: 2-3
Estimated cost at the 2001 base price level (without VAT)
Total: thousand rubles: 29970,62
Construction and installation works: thousand rubles: 20491,50
Equipment, thousand rubles: 3937,51
Other expenses, thousand rubles: 5541,61
including
PIR thousand rubles 1854,62
refundable amounts thousand rubles 42,15
Estimated cost at current price level March 2011 (VAT included)
Total: thousand rubles: 181973,03
Construction and installation works: thousand rubles: 142693,81
Equipment, thousand rubles: 12080,33
Other expenses, thousand rubles: 27198,88
including
PIR thousand rubles: 5652,21
VAT thousand rubles: 27338,22
refundable amounts, thousand rubles: 293,49

 Facades. The facades are plastered, with two color schemes over the plaster layer. Façade color scheme is offered in RAL1033 (light yellow); but can be specified on the basis of instructions, since the building is located in the zone of protection of cultural heritage sites. Creped elements - squares - overhead, made of insulation on an adhesive composition, followed by plastering and painting. Profile rods (moldings) - simple form, three-stage, 150 wide, 30 mm high. overhead, polyurethane, on the adhesive composition for preparation for the finishing plaster layer. They are installed before applying the finishing plaster and painting, glued to the mesh. Adhesive composition and application technology as recommended by the manufacturer. Painted at the same time as overlays. Window and door external slopes - plastered on a grid on a heater. Paint with color 9010 (white). Window sills are white. Double-glazed windows are white. Roof. The roof is combined, of two types: attic combined and on reinforced concrete slabs with monolithic sections. The attic, which has a combined roof, is covered with roofing iron with a factory color (RAL 2005 color scheme). Seam roof, iron with factory coloring over the waterproofing layer; as a continuous crate along the girders, a SMP-12 mm glass-magnesite slab is used, which serves as additional thermal insulation and eliminates cold bridges on metal girders. The lower parts of the roof are organized into reinforced concrete slabs and a monolithic section. Insulation - Rocwool Roof Batts 250 mm, laid between the beams along the corrugated board and along the vapor barrier on monolithic and prefabricated sections. A slope to ensure drainage from lowered parts is organized by a frame that provides ventilated cavities. Ventilation is provided by the installation of ventilation hoods (wind vanes (on the crate, with an apron inserted under the waterproofing layer. The ventilation hood should be of the VILP 110/200 (Vilp-Vent) type, tinted, orange. To ensure fire-fighting requirements for a combined roof, the frame is lined from the inside with two sheets of GKLO with The access to the roof is carried out by external metal stairs, to the least high part of the building with an ascent to the roof sections with a small slope and an additional ladder, for ascent to higher areas already from the roof plane. 53254 P) with a fence, from strips on the edge and round steel. Placed on the southern facade - on the stairwells, on the northern - on the bay window. Fastening stairs - to brickwork on load-bearing anchors, to a section of aerated concrete wall - on fixing anchors, on roof - to monolithic sections or roof panels through the roofing through sealing cuffs. Run on Series 2003-1. The height of the fence is 2 mm from the roof plane, which meets the requirements of Annex D (mandatory) GOST 1.100.2-5. Drainage from the roof - external, the system of drainage ebbs, gutters is carried out as part of roofing works from component roofing materials; drainpipes - fiberglass. Rainwater runoff - to the asphalt pavement, then - to the lawns. Drainage of rainwater from pits - to the ring drainage. Ventilation ducts facing the roof are assembled in blocks. The blocks are insulated with mineral wool mats, sewn up with fiber cement panels over a metal frame, covered with roofing material. Ventilation equipment installed on the roof is painted in a color scheme corresponding to the color scheme of the roofing. Fittings for low-voltage networks and systems are attached through the crate to the purlins on clamps with sealing gaskets and sealing of the fastener. Filling window and door openings. Filling window openings - for rooms where there are children and medical facilities - metal-plastic double-glazed windows with micro-ventilation, custom-made. In the sports hall, internal glasses are installed type A1, with anti-shock treatment. In the administrative and auxiliary premises, the installation of single-chamber double-glazed windows is provided. Each window is provided with at least one insect screen cassette for the part to be opened. The window openings of the stairwells are filled with individually made stained glass windows. Doors external stairwells 3,4,5 - entrances to group and office - insulated glazed, stairwells 1,2 - entrances to group - glazed as part of stained-glass fillings. External doors to the loading catering unit, electrical panel room, wheelchair doors - deaf fire-fighting. The doors in the pits are glazed and insulated. The absence of double vestibules is compensated by the installation of air curtains. Pit covers - transparent polycarbonate over a light metal frame with a slope from the facade. Canopies over the entrances are frame, gable. Covering the canopies above the entrances - with a profiled sheet on a light metal frame, factory painted, in the color of the roofing. Installation of the frame - after finishing the facade for finishing plaster. Installation of the profiled sheet - after painting the frame. Walls and partitions. The building is designed with load-bearing external and internal walls made of aerated concrete blocks D600 with a thickness of 400 - external walls and a longitudinal wall along the axis 4, and 300mm. Planning blocks - group rooms, thus, are allocated with capital walls, which perform both the function of a fire barrier between the blocks, and have sufficient sound insulation. The walls of the stairwells and the pool area are made of brick, solid red brick, 380 mm thick. Partitions are provided frame made of GKL, GKLO, and GKLV, 100 / 150 mm thick, designed in accordance with SP 101-55-2000 according to the album of standard solutions M8.12 / 06 "TsNIIpromzdaniy" complete systems of plasterboard sheets Giprok-Isover-Weber " with frame stud spacing 400 and 600 mm and filled with Izover brand 75. Single-layer partitions 100 mm OS101 with airborne sound insulation index Rw = 44 dBa excluding facing material, and fire resistance limit EI 30, are installed between technical and auxiliary rooms, to which there is no there are special requirements for soundproofing. Partitions 150 mm, two-layer OS 202 with sound insulation index Rw = 52 dBa are designed between rooms where there are requirements for sound insulation, defined by regulations or planning considerations - between bathrooms and bedrooms in group rooms, between rooms of a medical block, between administrative premises, between technical premises. The frame guides are mounted on self-adhesive polyurethane foam sealing tapes. GKL fastening to the frame is carried out in steps of at least 300 mm. The ventilation chambers located under the corridor of the medical unit, the heating unit and the water metering unit are designed with additional noise-absorbing cladding, which is a layer of thermal insulation "Isover-zvukozashchita" with a thickness of 50 - 100 mm, installed directly on the wall and ceiling, respectively, and covered with fiberglass under metal mesh No. 10. The calculation for the ventilation chamber is given in Appendix 4, l.4 volume 5.4.1. as part of noise protection measures for ventilation systems. Wall decoration. Group rooms - locker rooms, playrooms, bedrooms -: painting with water-dispersion paints of light colors according to high-quality preparation; - bathrooms - facing with ceramic tiles to a height of 2,1 m, above, painting with high-quality water-dispersion paints in light colors or suspended ceiling. Premises for medical purposes - in the wards of the isolation ward, in the rooms for the preparation of disinfectants, storage of detergents - ceramic tiles to the full height, in the doctor's office, in the office of physiotherapy - ceramic panel at the sinks / washbasins, to a height of 1,5 m; The rest of the walls are painted according to high-quality preparation. In auxiliary rooms with floor ladders - a room for storing honey. waste, a room for the collection and temporary storage of food waste - facing to the full height. The premises of the catering unit - ceramic tiles to the full height. Floors and ceilings. Ceilings are made of prefabricated multi-hollow slabs without formwork. The floors in the nursery rooms are designed to be warm with water heating, on mats with Varionova clamps. The mats contain polystyrene foam thermal insulation 30-50 mm thick, as well as wall-mounted perimeter insulating tape, which makes heated floors “floating”. Floating floors are also provided in the basement (floor type 0-2,0-3,0-4,0-5), where ventilation equipment, a water meter, ITP, and a laundry are located. As part of the preparation for floors of all types on ceilings, the installation of a sound-proof layer Stenofon 290 ("Polyfas") with an institution of 50 mm on the wall is provided. As part of the preparation for floors of all types in the basement under the screed, the installation of extruded polystyrene foam sheet, 35-80 mm thick, with wall insulation 50-100 mm high, respectively, is provided. For floors, non-slip ceramic tiles were used for rooms in the basement, corridors, catering department, for medical rooms, storerooms and other auxiliary rooms. The floors of landings and flights of stairs are faced with ceramic tiles with a non-slip surface and a relief profile along the treads. The plinth is made from tile halves. In the group rooms (playrooms and bedrooms) a laminate floor is provided, in the group nurseries the floor is heated with water. For the gym, a specialized playing surface for Graboflex kindergartens is provided. Suspended ceilings "Armstrong" with the use of sound-absorbing plates. In the corridors, Armstrong-Keramagvard NG (KM0) slabs are offered. Slatted ceilings are offered for the pool and showers with changing rooms, as well as for bathrooms. The ceilings of the attic rooms are combined hemmed gypsum boards with the additional purpose of fire insulation of the attic load-bearing structures. In the premises of the water metering unit, ITP and pumping ITP, the ceilings are hemmed with sound-absorbing mats "Isover-zvukozashchita" 100 mm thick, with fiberglass under metal mesh No. 10. In the premises of the catering unit - paint the ceilings with oil paint. planning organization. The planning structure of the building of the preschool educational institution is based on the principle of group isolation, in which the group cell is the place of the main stay of children with the implementation of the main group and individual activities with children, games, recreational activities, rest, daytime sleep, dressing and feeding, in accordance with the sanitary and hygienic requirements of the joint venture 3231. From the locker room of each group cell, convenient and short access to the external exit from the building is provided in accordance with the requirements of section 6 of SNiP 21-01. The second evacuation exit from the group cell is provided to another evacuation zone. Group cells are designed with a pronounced functional zoning, with the maximum use of the building's exposure to create a comfortable playing and learning environment. The hall for music lessons is located in the bay window. The presence of a bay window creates additional opportunities for transforming the hall when organizing holidays, installing additional equipment, and arranging an “auditorium and stage”. The bathing room of the pool is also located in the bay window, on the 1st floor. Entrance for children is organized through locker rooms-showers with the installation of foot baths 0.8x0.8m; entrance to the nursing and coaching rooms is provided from the bathing room. The sports hall is formed above the catering unit. There are 2 exits from the gym and the hall for music lessons; for the music hall - to different evacuation zones. The structure of the kindergarten building includes a mandatory set of premises and areas in accordance with applicable regulations. Additionally, there is a physiotherapy room. The structure of the premises of the designed kindergarten includes:

• 1st floor - elev. 0.000: Group cell for 15 places for children from 1 to 3 years old - 2 cells; rooms 101÷105 and 126÷130; Group cell for 20 places for children from 4 to 5 years old - 1 cell; rooms 133÷137; Medical block; rooms 109, 110, 110a, 111, 112, 112a, 113a, 136; catering unit; rooms 140÷149, 149a; Pool premises with changing rooms and showers, premises, 120,122,123; Auxiliary pool premises: trainer's room, nurse's room, stock room 116,117,118; corridor - 150; Bathroom for staff; room 139; Switchboard - 138; Storage room for cleaning equipment; room 122; Security room, combining the function of the control room of engineering networks and building systems.  
• 2nd floor - elev. 3.600. Group cell for 20 places for children from 3 to 4 years old - 2 cells; rooms 201÷205 and 224÷ 228; Group cell for 20 places for children from 4 to 5 years old; rooms 229÷233 and 224÷227; Group cell for 20 places for children from 5 to 6 years old - 1 cell; rooms 215÷219; Hall for music lessons; room 222; pantry inventory; room 221; Linen; room 220; Gym; room 210; coaching; room 212; Pantry of sports equipment; room 208; Bathroom for staff; room 209; Elevator - room 213; Storage room for cleaning equipment; room 211;
• attic - elev. 7.200. Additional facilities for working with children; rooms 301÷305; A room for classes on a computer; room 318; Fine art studio; room 320; Circle of folk art; room 323; pantry inventory; rooms 319, 321, 324; Office of the head of the kindergarten; room 313; methodical office; room 312; Linen; room 316; manager's office; room 311; Supply manager's pantry; room 310; Accountant's office; room 314; Physiotherapy room with bathroom; room 326, 326a; Storage room for cleaning equipment; room 308.
• Basement - elev. - 2.55. Auxiliary services are located in the basement premises: Laundry rooms: washing, ironing, storage room for clean linen; premises 029-033; Welfare premises for personnel with shower room 034 - 037; Repair shop with utility room, workshop pantry; premises 024-026; ventilation chambers; premises 007,011,028,028.1 Water meter unit; room 015; Heating unit with pumping station; room 014 014*; Stroller No. 1; room 027; Stroller No. 2; room 020; Storage room for walking equipment 016; Room for telecommunications equipment 017
o Pantry for temporary storage of food waste 009; Room for temporary storage of group B medical waste and temporary storage of used mercury lamps 010; Elevator shaft - 043; Room for placing UPS (uninterruptible power supplies) -040; Electrical cable entry room-039.

Space planning solution.

The space-planning solution for the building of the preschool educational institution was adopted by the architectural appearance and the fundamental planning structure of the reconstructed building, the features of the perception of a separate children's institution in the existing building. According to the spatial solution, the reconstruction of the building of a preschool educational institution is the development of the existing kindergarten building built in 1938. The existing building was built in the form of a rectangular two-story volume with an extension on the north side. The extension is made with a half-floor number of storeys, as a result of which the second level is a full-fledged extension floor, the third level is, in fact, an attic, and the first level, in terms of the ratio of the height of the room and the position of the windows relative to ground level, should be considered as a semi-basement. The northern end of the extension is a semicircular bay window. The architectural decoration of the facades of the main, rectangular volume, from the southern, eastern and western sides, is solved in the form of simple rods framing window openings on two floors and in pairs, as well as rectangular blades under the windows of the 2nd floor. The walls are completed with a profiled cornice. On the south side, there are remains of porches of separate exits from the group premises directly to the territory of the preschool educational institution. Exits - wooden glazed doors sealed with improvised materials, similar to verandas. The entrances to the stairwells had low porches with simple cantilevered canopies. Basements, which are available only under part of the building, after construction become a full-fledged basement floor, accommodating all the technical services and ancillary facilities necessary for the normal functioning of the preschool educational institution.