Standard project 264-12-73

Base price with VAT
Discount price
Price $920.00
Discount
Price $920.00
Index: 01022000
Data Sheet: Design, working documentation including estimates
Sections: all sections
Data volume: 230 MB
File Format: *.dwg, *.xlsx, GrandSmeta
Expert opinion: a positive
Design, working documentation including estimates for a comprehensive overhaul of the district house of culture standard project 264-12-73
Technical and economic indicators
The total area of ​​the building is 3439,7 m2.
Construction volume of the building - 19082 m3.

General information. Brief description of the overhaul object.

The House of Culture was erected according to the standard project 264-12-73. Number of floors of the building: 2-storey, complex configuration in plan. The roof of the building is partly gable with an unorganized drain, partly pitched. The foundations are made of prefabricated concrete blocks. External and internal walls are brick. Ceilings - 1st and 2nd floors, basement - reinforced concrete. The designed building consists of 2 floors of complex configuration with a basement. Overhaul of the RDK standard project 264-12-73 has dimensions in the axes 1-13 -75,22 m A-H -56,00 m. In the axes 1-2 / B-D there is a sports hall with dimensions of 24,32 x 11,35, 0.000 m., external and internal walls - brick. The walls of bathrooms and wet rooms are tiled. The walls of the sports hall are brick. Additional lighting is provided through window openings. Communication between floors is carried out through a staircase. For people with limited mobility, an entrance is provided through the main porch. The height of the administrative part of the building from 11.880 m to the edge of the wall is 7.690 m, the height of the building in the area of ​​the sports hall is XNUMX m Natural lighting is provided by window glazing on the facades. Natural lighting is provided by window glazing on the facades. The roof is complex, mostly gable. The entire roof area has an external drainage system. The bearing element of the roof frame in the area of ​​the administrative part of the building are concrete slabs of the roof, the bearing element of the part of the roof of the sports hall are concrete slabs of the roof. The roof covering of the administrative part and the sports hall is a material of the ROOFING material type. The total roof area is approximately 2106,00 m2. The basement is used to service the engineering systems of the building of the House of Culture, it provides for the installation of a floor made of porcelain tiles on a cement screed M150, the ceiling and walls are painted with water-based acrylic color paint, ROTBANT gypsum plaster. The administrative part of the building consists of 2 floors, includes bathrooms, halls, corridors, a canteen, locker rooms, service rooms, stairwells, storerooms, offices, inventory storage rooms, a coaching room, a reading room, a library, a gym, an auditorium, room for choreography classes. In this part of the building, it is planned to completely replace the flooring in places where linoleum is replaced with wear-resistant linoleum of the Relin type, in places where porcelain stoneware tiles are replaced with porcelain stoneware tiles 400x400x10 mm, laid on glue type "Eunice Granite". We provide floor screed from cement M150. It also provides for a complete replacement of wall decoration. Plaster putty layer gypsum type ROTBANT 10mm thick. Fine finishing in places of painting - we take water-based acrylic color paint, in places where porcelain tiles are installed - porcelain tiles 400x400x10 mm are laid on glue such as "Eunice Granite". We paint the ceiling with water-based acrylic type PHYLAX, ALLIGATOR color paint on a gypsum base type ROTBANT with a thickness of 10mm, and we also use a ceiling of the "ARMSTRONG" type and metal lath. Gym premises on the floor - complete replacement of sports parquet with a new one. We paint the walls and ceiling of the sports hall Primer-enamel for metal, brand "Armokot F100" (TU 2312-009-23354769-2008). In the locker rooms, we paint the walls and ceiling with water-based acrylic paint of color type PHYLAX, ALLIGATOR, the base for painting is a plaster and putty layer of gypsum type ROTBANT with a thickness of 10 mm. The combination of sanitary requirements, according to technological conditions, and fire-prevention requirements, according to altitude parameters, determine the features of finishing solutions. The premises, depending on the required degree of cleanliness, fire safety requirements, protection against harmful effects, as well as environmental and aesthetic requirements, have the appropriate floor, wall and ceiling finishes. Doors at emergency entrances, metal GOST 31173-2003 with insulation, Internal door blocks: single-floor, partially double-floor solid polished, solid pine, tinted and PVC- Internal door blocks: solid (filled with panels or other opaque materials) GOST 30970-2002, one and a half metal entrance door in accordance with GOST 31173-2003, insulated. Door units are supplied by the manufacturer with leafs hung on hinges (two-leaf additionally with mortise bolts) with full factory readiness and finished surface, attached devices, sealing gaskets. Installation of all devices included in the specification must be carried out by the manufacturer. To protect against mechanical damage, reduce noise and heat loss in buildings, the entrance and vestibule door blocks supplied by the manufacturer must be equipped with automatic closing devices for doors of the SAV, PSC, PSP type in accordance with GOST 5091-78. A box without a threshold is embroidered at the bottom with a mounting board with nails fastened to the ends of the vertical bars. Installation and fastening of door blocks in the opening. The building is completely replacing window blocks with windows according to GOST 30777-2012, double-leaf, with a deaf and tilt-and-turn sash, double-glazed window (32 mm). The manufacture of window units, including painting, glazing, installation of protective grilles and sealing gaskets, their marking, acceptance, storage and transportation must be carried out in accordance with the requirements.