Major overhaul of the school standard project 2p-02-2

https://proekt.sx

Online store for reuse projects

Cart is empty

Did not you find what you were looking for? Ask us! We have archives of 140 TB. We have all modern reuse projects and renovation projects for Soviet standard buildings. Write to us: info@proekt.sx


Standard project 2р-02-2

Base price with VAT
Discount price
Price $1,540.00
Discount
Price $1,540.00
Index: 16022001
Data Sheet: Design, working documentation including estimates
Sections: all sections
Data volume: 145 MB
File Format: *.pdf, *.xlsx
Design, working documentation including estimates for the overhaul of the school building standard project 2Р-02-2
Technical and economic indicators
Capacity:
students, people: 640
attendants, people: 113
Total land area, m2: 19321
Total built-up area of ​​the building, m2: 2569,3
Construction volume, m3: 21340
Total area of ​​premises, including, m2: 4812,46
1st floor, m2: 2008,01
2st floor, m2: 1173,43
3st floor, m2: 1173,26
basement, m2: 457,76
Floors of the building floors: 1, 3
Building height, m: 15,03

General information.

Purpose of the object - municipal autonomous educational institution - school (standard project 2Р-02-2). The designed object does not fall into the category of transport facilities. infrastructure, presence or movement of passengers, cargo and baggage is not Provided. Possibility of occurrence of dangerous natural processes and phenomena and man-made impacts on the territory where construction and operation of the building, absent. The designed facility does not belong to hazardous industrial objects. Building category for explosion and fire hazard - D (reduced fire hazard). The building has premises with a permanent stay of people (more 2 hours): classrooms, staff rooms, medical room, catering unit, sports hall, assembly hall, workshops, library, security point. The level of responsibility of the building is normal. Functional fire hazard class - F4.1. The degree of fire resistance of the building is II. Constructive fire hazard class - C0.

Organization of work on the overhaul of the school standard project 2Р-02-2

The organization of construction and installation works provides for two periods: preparatory and main. The composition of the works of the preparatory period includes: clearing and planning of areas; fixing the designed structures on the ground; organization of work on the uninterrupted supply of materials, structures, equipment; accommodation of workers and organization of their life; studying and agreeing on the conditions for the performance of work; creation of a temporary communication system for the period of construction; arrangement of temporary on-site passages; providing the place of work with fire-fighting equipment, lighting and signaling equipment. The composition of the main period includes: partial redevelopment of the premises by dismantling old and installing new partitions; replacement of flooring with the use of materials in accordance with the purpose of the premises; arrangement of interior decoration with the use of finishing materials in accordance with the purpose of the premises; arrangement of the stage in the assembly hall; installation of new window blocks and window sills made of PVC profile; installation of new door blocks; installation of cabins from sanitary partitions in the bathrooms; installation of new and expansion of existing door and window openings in the walls; repair of external walls; reinforcement of piers in the outer walls; installation of a facade insulation system with a protective and decorative layer of thin-layer plaster; repair and strengthening of slabs and crossbars of ceilings and coatings; replacement of ladders for access to the attic; roof repair: complete replacement of the roofing with a coating insulation device; arrangement of an organized external drainage system; roof fencing; installation of snow-retaining devices; the device of metal stairs in places of difference in the height of the roof; repair of reinforced concrete steps of internal stairs; repair of the railing of internal stairs; dismantling of existing and installation of new reinforced concrete porches, ramps; arrangement of entrance visors; foundation waterproofing device; strengthening the base of foundations; repair of the blind area around the perimeter of the building; repair of networks of heat supply, power supply, electric lighting, water supply, sewerage, heating and ventilation; fire alarm system device; arrangement of a warning and evacuation control system; security television system; repair of asphalt concrete pavement of driveways and footpaths; arrangement of passage for fire equipment; arrangement of a utility site for garbage containers 3x3 m; arrangement of sports grounds with a set of gaming and sports equipment; improvement and gardening of the territory; replacement of fencing.