Standard project of the school 2C-02-7

https://proekt.sx

Online store for reuse projects

Cart is empty

Did not you find what you were looking for? Ask us! We have archives of 140 TB. We have all modern reuse projects and renovation projects for Soviet standard buildings. Write to us: info@proekt.sx


School standard project 2C-02-7

Base price with VAT
Discount price
Price $1,500.00
Discount
Price $1,500.00
Index: 23082201
Data Sheet: Working documentation including estimates
Sections: all sections
Data volume: 608 MB
File Format: *.pdf, *.xlsx
Working documentation including estimates for the overhaul of the school standard project 2C-02-7.
Technical, economic, other indicators.
Floors, floor: variable (2 and 4)
Floor height, m: 3,3
Total building area, m2: 4977,4
Construction volume of the building, m3: 25767,6
Building area, m2: 2374,2
The length of the pipeline of the heating system, m: 1582
Length of the cold water supply system, m: 333,5
The length of the hot water supply system, m: 475,6
Length of the drainage system, m: 255,0

General information.

The school building was built according to the standard project 2s-02-7. The functional purpose of the object is a public building (general educational institution). The overhaul object is a multi-level building consisting of a four-story classroom block and a two-story school block with locker rooms, a gym and a catering unit on the 1st floor and an assembly hall on the 2nd. The school building provides for the number of students - 748 people, the number of employees - 88 people. The project provides for a major overhaul of water supply, sewerage, heating systems with the removal of its pipelines from the underground and underground parts, ventilation, as well as power supply and power supply systems, communications and signaling. It is planned to replace the partitions of the first floor, repair the interior and exterior of the building, repair the entrance groups, and repair the roof.

Authorization