Archive building project

Base price with VAT
Discount price
Price $1,000.00
Discount
Price $1,000.00
Index: 73.182.274
Data Sheet: Project documentation including estimates and results of engineering surveys
Sections: all sections
Data volume: 276 MB
File Format: * .pdf
Expert opinion: a positive
Archive building
Design documentation including estimates and results of engineering surveys for the construction of the archive building. Estimated Cost Verification

Technical and economic characteristics of the capital construction object
Plot area within the land allotment, ha: 1,7772
Building area, m2: 1444,71
Total area, m2: 12922,67
Construction volume, including: 45085,49 m3
underground part: 3939,84
overground part: 41145,65
Floors, fl.: 9
Estimated cost at the 2001 base price level (without VAT)
Total: thousand rubles: 171
Construction and installation works, thousand rubles: 72
Equipment, thousand rubles: 90
Other expenses, thousand rubles: 9
including:
PIR, thousand rubles: 1931,99
refundable amounts, thousand rubles: 184,97
Estimated cost in the current price level of the IV quarter of 2011 (including VAT)
Total: thousand rubles: 846
Construction and installation works, thousand rubles: 463
Equipment, thousand rubles: 326
Other expenses, thousand rubles: 56
including:
PIR, thousand rubles: 9
VAT, thousand rubles: 129
refundable amounts, thousand rubles: 1

Architectural and space-planning solutions

The main dimensions of the building in the axes are 52.5 m x 24 m. The designed building is rectangular in plan, with a combined flat roof, served by two staircases that divide each floor (from the 2nd to the 9th) into two opposite compartments. A basement is being designed in the building to accommodate engineering facilities and communications. The height of the building from the ground to the top of the parapet is 30.54 m (34.44 m in the area of ​​the ventilation chambers). The degree of durability of the building - II. The degree of fire resistance of the building - II. Functional fire hazard class - F5.2. The class of constructive fire hazard of the building is С0. The building has nine floors. Height of rooms in the building: 3.02 m; in ventilation chambers - 3.6 m. Bearing structures - a monolithic reinforced concrete frame (columns, crossbars, floor slabs, stair-lift units). The roof is flat, combined insulated, with an internal drain. External enclosing structures of walls: - three-layer sandwich panels manufactured by "Armaks" with non-combustible insulation "PAROC" based on basalt rocks y = not less than 115 kg/m3, thickness 150 mm. The measured reduced heat transfer resistance is 3,16 m2 ° C / W. Calculation of the thickness of the insulation, see. application 1. - aluminum stained-glass constructions of ZAO EvroStroyStandart. Profile: aluminum facade "thermo-insulated" filled with a single-chamber double-glazed window, with energy-saving glass. Transparent filling of a stained-glass window: double-glazed window according to GOST 24866-99: brand of double-glazed window 6M1-14Ag-I4; Aluminum profile of the Krasnoyarsk Profile system according to GOST 22233-2001, flammability group - G1 according to GOST 30244-94, flammability group - B1 according to GOST 30402-96, smoke-generating ability group - D1 according to GOST 12.1.04489, group according to the toxicity of combustion products - T1 according to GOST 12.1.04489; Profile color is dark brown. Metal-plastic windows in accordance with GOST 30674-99 with double-glazed windows and energy-saving glass in accordance with GOST 24866-99. Plinth made of wall aerated concrete blocks (GOST 21520-89) D600, strength M35, on adhesive mortar; insulated from the outside with Penoplex 45 y=45 5=80 mm slabs (produced according to TU 5767-006-56925804-2007), Tranitogres facade tiles (porcelain stoneware). Internal partitions: 250 mm thick, made of hollow ceramic effective brick KORPu1NF/150/1.2/50/GOST530-2007 with reinforcement and attachment points according to series 1.431.6-28 on cement-sand mortar M50. partitions 100 mm thick, made of aerated concrete wall blocks (GOST 21520-89) D400, strength M35 on adhesive mortar. Reinforcement through 2 rows of blocks; partitions 200 mm thick, made of aerated concrete wall blocks (GOST 21520-89) D400, strength M35 on adhesive mortar. Reinforcement through 2 rows of blocks; Moisture-resistant partitions made of solid chipboard 30 mm, lined with melamine film with a supporting surface of laminated plastic 0,8 mm thick. The roof of the building is made of: Non-exploited, low-slope combined roofing, insulated bitumen-polymer welded rolled carpet (Isoplast), 4,5 mm thick, flammability group G1, manufactured according to (TU 5774-00505766480-96). The top layer of insulation is a non-combustible mineral wool board RUF BATTS B (Rockwool) = 190 kg / m3, k = 0,045 - 40 mm (TU 5762-005-45757203-99). The lower layer of insulation is a non-combustible mineral wool board RUF BATTS N (Rockwool) = 115 kg / m3, k = 0,042 -130 mm (TU 5762-005-45757203-99). Vapor barrier type ROCKbarrier, 0,2 mm thick. On a monolithic reinforced concrete slab, 200 mm thick. The roof above the ventilation chambers is not in use; two external vertical metal ladders are provided for climbing to the roof. Drainage from the roof is provided through the internal drainage system. Atmospheric precipitation is removed through water intake funnels installed on the roof, they approach vertical risers mounted on the walls of the building, then the precipitation enters the external sewage system (see section VK). Stairs and elevators connect the floors from the first to the ninth. Elevators are provided with a carrying capacity of 400 kg and 1000 kg. JSC "Shcherbinsky Elevator Plant" One of the elevators is designed with a cabin depth of 2550 mm. Elevator shafts are located in the central part of the building, machine rooms are located on the roof. The main color of the archive building is beige RAL 9003. Auxiliary and administrative premises are located on the first floor between axes 1-5, A-D. The entrance to the ventilation chambers is carried out by internal monolithic stairs of type H 2. Access to the roof of ventilation chambers is carried out by metal vertical ladders 800 mm wide type P 1 (GOST R 53254-2009. Vertical metal stairs go from +29.850 to the top of the cover. Regulatory illumination in the premises of the building is provided by lighting through windows in the outer walls and artificial lighting with fluorescent lamps in accordance with SNiP 23-05-95 *. The normative value of KEO is provided in premises with permanent residence of people (according to SanPiN 2.2.1/2.1.1.1278-03 2.1.1 and SNiP 23-05-95*). In the room of the equipment workshop, a low-light zone is allocated (SanPiN 2.2.1/2.1.1.1278-03 p.2.3.5), the workplace is located in a zone of sufficient natural light, this room provides for a very bright interior finish. The booklet room is not a room with a permanent stay of people, it has a zone of insufficient natural light (SanPiN 2.2.1/2.1.1.1278-03 p.2.3.5), the workplace is located in a zone of sufficient natural light, this room provides for very bright interior decoration. The normative value of KEO in accordance with SP-23-102-2003 clause 8.8 with a depth of 5 m or more in offices is taken as 0,6% in relation to a combined lighting system. All the considered cabinets are more than 5 m deep.

Structural and space-planning solutions

Structural solutions are developed for the following construction conditions: building responsibility level - I6; degree of fire resistance - I; calculated average monthly temperature -26 С° (SNiP 23-01-99); snow load is assumed to be Sg=1.8 kPa (III snow region); standard value of wind pressure Wo=0.3 kPa (II region according to SNiP 2.01.07-85*). The values ​​of standard loads are taken in accordance with the requirements of SNiP 2.01.07-85*. Structural analysis was performed in accordance with the requirements of SNiP 52-01-2003. The protective layer of reinforced concrete load-bearing structures is adopted in accordance with SNiP II-2-80. The geological structure of the site according to drilling data to a depth of 32.0 m is represented by: modern technogenic formations (tIV), Upper Quaternary deposits of lacustrine-glacial (igui) and glacial (gIII) genesis, occurring on Lower Cambrian clays (G1). Technogenic formations are represented by compacted bulk soils up to 4.2 m thick. It should be noted the heterogeneity of the lithological composition of EGE-1 and the presence of organic matter and interlayers of weakly peaty soils in them. Lacustrine-glacial deposits are represented by semi-solid loams (IGE-2) underlying technogenic formations at depths of 1.8–4.2 m (abs. elev. 5.1 m - 7.6 m). The thickness of the loams was 1.0 m - 5.1 m. Glacial deposits are represented by a layer of loams from soft-plastic to semi-solid consistency, locally - by hard sandy loams. Glacial deposits are exposed at depths of 4.2 m - 7.1 m (abs. elev. 2.1 m - 5.2 m). The total thickness of the glacial stratum reaches 19.8 m. Deposits of the Cambrian system of the lower section are exposed at depths of 21.0 m - 24.4 m (abs. elev. minus 11.5 mm - minus 15.2 m) and are represented by hard clays. The exposed clay thickness reaches 11.0 m. In the studied area, groundwater is confined to interlayers, lenses and nests of sands in clayey soils of technogenic formations, lacustrine-glacial and glacial genesis. For the survey period, groundwater was discovered by all wells at depths of 0.9 m -2.6 m (abs. elev. 6.7 m - 8.4 m). The waters are unpressurised. The maximum levels of groundwater should be expected close to the surface of the earth (abs. elev. ~8.0 m - 9.0 m). Bulk soils (IGE-1) and lacustrine-glacial loams (IGE-2) occur in the freezing zone. The normative depth of seasonal freezing of bulk soils is 1.69 m, loams -1.14 m. The remaining soils lie below the depth of seasonal freezing. According to the degree of frost hazard, soils in the freezing zone are medium heaving (IGE-1) and strongly heaving (IGE-2) - t.B.27 GOST 25100-95. Groundwater, in accordance with SNiP 2.03.11-85, is non-aggressive to concrete grades W4, W6, W8 and to reinforcement of reinforced concrete structures (app. 5, sheet 3).3. Groundwater, in accordance with GOST 9.602-2005, has low corrosive aggressiveness in relation to the lead sheath of the cable and high - to aluminum (adj. 5, sheet 4). Soils, in accordance with GOST 9.602-2005, have a high degree of corrosive aggressiveness in relation to structures made of carbon and low alloy steel. The EGE 5 layer (E=14,0 MPa, IL=0.25, c=36.0 kPa, f=25°) was taken as the foundation soil under the lower end of the piles. Bored piles made using the "Fundex" technology were adopted for the work. Cutting tip diameter d=670 mm, barrel diameter 520 mm. Pile material: concrete class B30, water permeability mark W=6, frost resistance mark F=100. The design load for BNS 520/670-172 piles is 180 tf. The constructive scheme of the building is solved by a frame-braced frame, where the main load-bearing structures are formed by a system of columns, horizontal floor disks, beams and vertical stiffening diaphragms. The monolithic load-bearing reinforced concrete frame of the Archive building was designed on the basis of calculations made in the calculation and analytical program "Structure CAD Office v.11.5" License No. 58902A6C. Monolithic reinforced concrete load-bearing structures are made of class B30 concrete. Reinforced with separate rods, meshes and frames from the working reinforcement A500 for bar elements and A400 for plate elements. Structural fittings adopted class A240. Reinforcing cages should be made according to the drawings of the KZh brand.