Cemetery project

Base price with VAT
Discount price
Price $890.00
Discount
Price $890.00
Index: 25052100
Data Sheet: Design, working documentation including estimates and results of engineering surveys
Sections: all sections
Data volume: 665 MB
File Format: * .pdf
Expert opinion: a positive
Capital construction object: Cemetery
Design, working documentation, including estimates, and the results of engineering surveys, for the creation of a cemetery
Technical and economic characteristics of the capital construction object.
Building area (ground part), ha: 0,08054
Area of ​​coverings (including the area of ​​coverings under a canopy), ha: 8,932776
Landscaping area, ha: 1,6898
Coverage area outside the land plot, ha: 0,22646
Administrative building
Building area, m2: 303,0
Total area, m2: 496,1
Construction volume, m3: 1940,0
Usable area, m2: 395,7
Estimated area, m2: 297,1
Floors, fl.: 2
Number of floors, fl.: 2
Building for mourning civil rites
Building area, m2: 502,4
Total area, m2: 330,0
Construction volume, m3: 1340,0
Usable area, m2: 301,7
Estimated area, m2: 275,3
Floors, fl.: 1
Number of floors, fl.: 1
Fire-fighting water tank with a capacity of
Tank volume, m3: 110
Quantity, pcs.: 2
Canopy for cleaning and maintenance equipment for 5 units
Building area, m2: 166,58
Cesspool, sump volume, m3: 4,00
Cesspool, sump volume, m3: 8,00
Stop complex of public transport
Building area, m2: 7,20
Regulating capacity
Tank volume, m3: 50
Quantity, pcs.: 2
Rain water storage tank, m3: 100
Columbarium, building area, m2: 3,07

General information.

The projected cemetery has the following parameters: cemetery affiliation - municipal; classification of the cemetery - public, with specialized areas for confessional burials; type of burial - mixed burial methods: traditional - with burial in the ground; with burials after cremation: in the ground; in the columbarium (columbarium wall). The site of the projected cemetery is divided into the following functional zones: entrance zone; ritual area; administrative and economic zone; zones (quarters) of burials (burials) consisting of: zone (quarter) of military and honorary burials; zone (quarters) of public burials; zones (quarters) of confessional burials: according to the Christian rite; according to the Muslim rite; according to the Jewish rite; according to the Buddhist rite; zone (quarter) of mass graves; zone (quarter) of burials in crypts and memorial structures, zone (quarter) of burials after cremation: in the ground; in columbaria (wall-columbaria); zone (quarter) of burials of unidentified persons, zone (quarter) of burials of persons without relatives (municipal funerals); zone (quarter) of burials of "unclaimed ashes"; reserve zone for burials; zones of "moral (green) protection". On the territory of the cemetery, the project provides for the construction of the following buildings and structures: a two-story administrative building; a one-story building for carrying out mourning civil rites; underground reservoirs for storing fire-fighting water; columbarium, underground cesspool septic tank for domestic sewage; underground treatment facilities for the collection and purification of storm and melt water; territory fencing; small architectural forms: bus stops, sheds for recreation, sites for dry closets, sites for solid waste containers.