DKK project for 150 seats

https://proekt.sx

Online store for reuse projects

Cart is empty

Did not you find what you were looking for? Ask us! We have archives of 140 TB. We have all modern reuse projects and renovation projects for Soviet standard buildings. Write to us: info@proekt.sx


Project KFOR 150 seats

Base price with VAT
Discount price
Price $1,400.00
Discount
Price $1,400.00
Index: 28092001
Data Sheet: Project documentation including estimates and results of engineering surveys
Sections: all sections
Data volume: 143 MB
File Format: * .pdf
Rural house of culture for 150 people
Project documentation, including estimates, and the results of engineering surveys for the construction of a rural house of culture for 150 places
Technical and economic characteristics of the capital construction object
Construction volume m3 3669,7
Building area m2 633,18
Total area m2 514,04
Usable area m2 469,71
Estimated area m2 430,68
Number of floors pcs. 1
Floor height m 3,0/6,0
Building height (fire technical), m: 2,40
Building height (architectural), m: 8,86
Estimated construction cost (in Q4 2019 prices): RUB 31

Background:

The space-planning solution was determined taking into account the requirements of the customer in accordance with the agreed design task. The building is one-storey with dimensions in the axes of 18,0 x 27,0 m, without a basement. The projected building of the rural house of culture provides for: a universal hall measuring 12x18 m for meetings, cinema, concerts and sporting events; foyer for discos; library; circle; artistic with a storehouse of scenery; administration office; bathrooms; attached boiler room.

Constructive decisions:

When designing the building of the house of culture, measures are provided to ensure the requirements of energy efficiency: the use of a compact form of the building, which provides a significant reduction in the consumption of thermal energy for heating the building; the outer walls of the building are designed from an efficient expanded clay concrete block with silicate brick cladding; placement of warmer and more humid rooms near the inner walls of the building; the device of the entrance node with a vestibule; the use of effective translucent fences made of PVC profiles filled with double-glazed windows; an attached boiler house was designed to ensure minimal losses of thermal energy;

Authorization