Standard project of the pool 2С-09-15/67

https://proekt.sx

Online store for reuse projects

Cart is empty

Did not you find what you were looking for? Ask us! We have archives of 140 TB. We have all modern reuse projects and renovation projects for Soviet standard buildings. Write to us: info@proekt.sx


Standard design of the pool 2C-09-15 (code 258/61) / 2C-09-15/67

Base price with VAT
Discount price
Price $3,150.00
Discount
Price $3,150.00
Index: 18052300
Data Sheet: Working documentation including estimates
Sections: all sections
Data volume: 810 MB
File Format: *.pdf, *.doc, *.xlsx
Expert opinion: a positive
Working documentation including estimates for a comprehensive overhaul of the pool building, standard project 2C-09-15/67.
The project for the overhaul of the building of an indoor swimming pool with a bathtub 50x21 m.

General information.

The pool building was built according to the standard project 2C-09-15/67. The functional purpose and classification of the pool, including for the main bowl of the pool and auxiliary bowls - sports, classification - universal. Sports facility category - B. Total one-time number of visitors and staff in the building - 780 people. The one-time number of visitors to the main bowl of the pool is 96 people. and auxiliary bowls - 26 people, including visitors from the low-mobility group of the population (hereinafter referred to as MGN) - are not provided. Mobility group MGN – there are no conditions for MGN for the current period. The number of seats in the stands for spectators is 536 people. The dimensions of the pool bowl (length × width × depth) - 50,0 × 21,0 × 2,1 ÷ 5,1 (by water) m. The need to use a pool with a dedicated area for MGN is not required. The area of ​​the water mirror is 1 m050,0. The volume of water in the pool is 2 m3. Type of pool according to its purpose - universal educational and training. Type of pool - closed. The nature of water exchange is recirculation (overflow) type. HVS - centralized. The DHW system is a closed water intake scheme. Heating - centralized. Water disposal (water used in the pool bowl) - centralized networks of household sewerage. Water treatment (water heating) - from a heating system with closed water intake. The heating system is a dependent circuit. Bath (bowl) of the pool - monolithic reinforced concrete. Facing of a bowl of the pool - a ceramic tile. Facing of floors around a bowl of the pool - a ceramic tile. The total area of ​​the pool bowl is 278,1 m3. The total area of ​​the premises of the building is 1780 m2.

Authorization