Car showroom and service station project

https://proekt.sx

Online store for reuse projects

Cart is empty

Did not you find what you were looking for? Ask us! We have archives of 140 TB. We have all modern reuse projects and renovation projects for Soviet standard buildings. Write to us: info@proekt.sx


Car showroom and service station project

Base price with VAT
Discount price
Price $1,400.00
Discount
Price $1,400.00
Index: 45.154.282
Data Sheet: Project documentation without estimates and results of engineering surveys
Sections: all sections
Data volume: 280 MB
File Format: editable formats
Expert opinion: a positive
Project documentation without estimates and results of engineering surveys for the construction of a car center complex (2 buildings)
Technical and economic indicators of the designed facilities

Technical and economic indicators of the designed service station with an automatic washing complex:
Building area: 1580 sq.m.
Total area of ​​premises: 4009,2 sq.m.
Construction volume: 16394,5 cubic meters
Floors: 3 + technical. floor
Building class: II
Constructive fire hazard class: CO
Fire resistance degree: II
Category of explosion and fire hazard: B

Technical and economic indicators of the Autosalon building:
Building area: 863,0 sq.m.
Total area of ​​premises: 480 sq.m
Construction volume: 6930,8 cubic meters
Floors: 2 + technical. Floor
Building class: II
Constructive fire hazard class: CO
Fire resistance degree: II
Category of explosion and fire hazard: B

Information about the functional purpose of the object

The projected Autocenter consists of two stages of construction: 1st stage - a three-story service station building; 2nd stage - Car dealership (2 floors). The purpose of the facility being designed is the washing and repair of cars, their pre-sale preparation and warranty service for sold cars. The STO includes the following production areas: 1st floor - tunnel wash, two manual car washes, diagnostic post, car maintenance and repair room, order reception department and a spare parts store. 2nd and 3rd floors - a cafe for 30 seats and administrative and amenity premises. The structure of the Autocentre includes: trading floors on the 1st and 2nd floors, rooms for service personnel. It is planned to provide the Autocentre buildings with all types of engineering communications - power supply, water supply, sewerage, heat supply from the roof gas boiler, communication and fire protection systems. Design solutions have been developed in accordance with the current standards, norms and rules and ensure the safe operation of facilities, subject to the measures provided for by the project for labor protection, safety and fire and explosion safety.

Architectural and space-planning solutions

The project documentation provides for the construction of a car center, designed from two buildings: the car center itself and a service station. The car center building is a two-story building with an upper technical floor, on which a ventilation chamber is provided. The building is rectangular in plan, with dimensions in the axes of 24,0 x 30,0 (m), the height of the building from the ground level to the top of the parapet (12,16) m, to the roof of the ventilation chamber - 15,89 m. The building has two stairwells (one of them - up to the level of the second - floor, the second for climbing to the roof and into the ventilation chamber) and a lifting table for moving cars to the second floor. The ventilation chamber room is designed at the exit point of the staircase near the E axis to the roof. An evacuation fire escape of the 3rd type from the second floor is provided on the facade of the building along axis 1. On the ground floor there are rooms for staff, office space for processing transactions, accounting and a control room. An exhibition hall is located on the second floor. The main façade, oriented towards the Revolution Highway, is designed with continuous glazing. The main entrance for visitors is provided from the side of the main facade of the building. The canopy above the entrance is made of tempered glass suspended on metal cables. Floors in all rooms (except for the ventilation chamber): trading floors, san. nodes, staff room, haz room. inventory, switchboard, - are provided from ceramic tiles. In the ventilation chamber there is a concrete floor with an iron surface. In office premises and in other premises with a permanent stay of personnel, flooring is carried out on a warm basis. The walls in the sanitary facilities and the household equipment room are lined with ceramic tiles to a height of 2,1 m. In all other rooms, the walls are painted with water-based paint. Service station (SRT). The service station building provides for pre-sale preparation, repair and maintenance of vehicles under warranty. The building is rectangular in plan, with dimensions in the axes 58,0x22,0 (m), the height of the building from the ground level to the parapet is 13,06 m, to the roof of the ventilation chamber and the boiler room - 15,89 m. On the first floor of the service station building, the following are designed: a maintenance room, order reception rooms, two car washes, an auto electrics shop, and auxiliary rooms. On the second floor there is a cafe with a pre-cooking workshop and office space. On the third floor - office space. A roof gas boiler room and a ventilation chamber are designed on the roof of the building. Three staircases are designed from the side of the facade along the D axis. Two of them are provided up to the technical floor with access to the roof, ventilation chambers, collector and gas boiler room. The height of the first floor to the false ceiling is 4,4 m, from floor to floor of the second floor is 5,15 m, the height of the second and third floors is 3,3 m each. Interior decoration and floor structures are adopted in accordance with the purpose of the premises. In office premises and in other premises with a permanent stay of personnel, the flooring is on a warm basis.

Structural and space-planning solutions

The level of responsibility of the autocenter building is II. The structural scheme of the building is frame. Columns - monolithic reinforced concrete, section 400x400 (mm). The main step of the columns is 6x12m. The columns are designed from B25 class concrete. Within the stairwell, which has access to the roof, the columns are designed from a metal square pipe 120x5 in accordance with GOST 30245-2003. Beams - monolithic reinforced concrete, section 700x400 (mm) and 400x400 (mm) from B25 class concrete. Ceilings - monolithic reinforced concrete slabs 180 mm thick made of B25 concrete. Covering - monolithic reinforced concrete slabs 160 mm thick made of B25 concrete. External walls - hinged sandwich panels 150mm thick. The outer walls are attached to the load-bearing structures using self-tapping screws. Internal walls and partitions - from aerated concrete 300 mm thick and tongue-and-groove gypsum boards 80 mm thick. The spatial rigidity and stability of the building is ensured by the joint work of rigidly interconnected columns, floors, roofs, foundation slabs and monolithic flights of stairs. The calculation of load-bearing structures was carried out on a computer using the SCAD Office program (version 11.1). The foundations are taken in the form of a ribbed slab of monolithic reinforced concrete on a sand cushion. The thickness of the foundation plate is 300mm, the height of the ribs is 300mm. Foundation concrete B25, W6, F100. Under the foundation, concrete preparation with a thickness of 100mm is provided along a sand cushion with a thickness of 1500÷3000mm. The relative elevation of 0.000 corresponds to the absolute elevation of +5.58m. In accordance with the report on engineering and geological surveys, the base of the sand cushion is silty plastic, layered, gray sandy loam with E = 90 kg/cm2. Estimated soil resistance R=2,0kg/cm2. The pressure on the foundation soil does not exceed P=0,35kg/cm2. The maximum groundwater level is at a depth of 0,5÷0,8m. Groundwater is slightly aggressive to concrete of normal permeability in terms of the content of aggressive carbon dioxide. In order to protect the concrete of underground structures, the concrete grade for water resistance is W6, the concrete surface is protected by coating with bituminous mastic twice. The expected average draft of the building is not more than ~ 2,6 cm. Service station (SRT). Building responsibility level – II. The structural scheme of the building is frame. Columns - monolithic reinforced concrete, section 400x400 (mm). The main step of the columns is 6x4,5m. The columns are designed from B25 class concrete. Within the upper floor, the columns are taken from a metal square pipe 140x5 according to GOST 30245-2003. Ceilings - monolithic beamless reinforced concrete slabs 180 mm thick made of B25 concrete. Covering - monolithic reinforced concrete slabs 160 mm thick made of B25 concrete. External walls - hinged sandwich panels 150mm thick. The outer walls are attached to the load-bearing structures using self-tapping screws. Internal walls and partitions - from aerated concrete 200mm thick and plasterboard on a metal frame 120÷140mm thick. The spatial rigidity and stability of the building is ensured by the joint work of rigidly interconnected columns, floors, roofs, foundation slabs and monolithic flights of stairs. The calculation of load-bearing structures was carried out on a computer using the SCAD Office program (version 11.1). The foundations are taken in the form of a slab of monolithic reinforced concrete on a sand cushion. The thickness of the foundation plate is 400mm. Foundation concrete B25, W6, F100. Under the foundation, concrete preparation with a thickness of 100mm is provided along a sand cushion with a thickness of 1500÷3000mm. The relative elevation of 0,000 corresponds to the absolute elevation of +5.68m. In accordance with the report on engineering and geological surveys of the year, the base of the sand cushion is silty sands of medium density, saturated with water, gray with E = 80 kg / cm2, e = 0,8. Estimated soil resistance R=2,0kg/cm2. The pressure on the foundation soil does not exceed Р=0,53kg/cm2. The maximum groundwater level is at a depth of 0,5÷0,8m. Groundwater is slightly aggressive to concrete of normal permeability in terms of the content of aggressive carbon dioxide. In order to protect the concrete of underground structures, the concrete grade for water resistance is W6, the concrete surface is protected by coating with bituminous mastic twice. The expected average draft of the building is not more than ~ 6,5 cm. A survey of the surrounding buildings has been completed. Buildings 1 canteen and the former carpentry shop (at a distance of 15 and 20m) are classified as technical condition in accordance with TSN 50-302-2004. The expected settlement of adjoining buildings is less than the maximum allowable. The project provides for the organization of observations of the buildings of the surrounding buildings.

Organization of construction

The construction master plan was developed on a scale of 1:500 for the period of construction of the above-ground part of the buildings, taking into account the preparatory period. The site is fenced in accordance with GOST 23407-78 in addition to the existing one. The existing roads with asphalt concrete pavement are used as temporary on-site roads. The movement of cars is provided in a circular pattern. At the exit from the site, a vehicle wheel wash is arranged. Temporary water supply and electricity supply - from existing networks according to the specifications of the owners. The mechanization of construction is complex. Work is carried out in 1 shift. Materials are stored in open areas with a margin of no more than 3-5 days. Provision of construction materials - from the enterprises of the construction industry. Stroygorodok - from temporary container-type buildings. The disposal of construction waste for disposal is provided for by a solid waste landfill. Duration of construction: 12 months. Number of employees: 34 people. The requirements for the organization of the construction site, labor protection and hygiene of construction work, methods of construction work, methods of instrumental control over the quality of construction, labor safety measures, and environmental conditions are met in full. The use of materials and mechanization specified in the project is justified by calculations and conditions for the production of work.