Projects of administrative buildings

https://proekt.sx

Online store for reuse projects

Cart is empty

Did not you find what you were looking for? Ask us! We have archives of 140 TB. We have all modern reuse projects and renovation projects for Soviet standard buildings. Write to us: info@proekt.sx


Administrative buildings

ABK building project

Index: 48.130.240
Data Sheet:
Project documentation without estimates and results of engineering surveys
Sections:
all sections
Data volume:
487 MB
File Format:
editable formats
Expert opinion:
a positive
Basic price with VAT:
Discount price:
Price: $190.00
A discount:

Courthouse project

Index: 96.125.293
Data Sheet:
Design, working documentation including estimates and results of engineering surveys
Sections:
all sections
Data volume:
571 MB
File Format:
editable formats
Expert opinion:
a positive
Basic price with VAT:
Discount price:
Price: $960.00
A discount:

Administrative building project

Index: 68.193.291
Data Sheet:
Project documentation without estimates and results of engineering surveys
Sections:
all sections
Data volume:
743 MB
File Format:
editable formats
Expert opinion:
a positive
Basic price with VAT:
Discount price:
Price: $1,210.00
A discount:

Administrative building project

Index: 91.131.256
Data Sheet:
Project documentation without estimates and results of engineering surveys
Sections:
all sections
Data volume:
1952 MB
File Format:
editable formats
Expert opinion:
a positive
Basic price with VAT:
Discount price:
Price: $2,000.00
A discount:

Data center project

Index: 3.150.203
Data Sheet:
Project documentation including estimates
Sections:
according to the scope of the project
Data volume:
248 MB
File Format:
editable formats
Expert opinion:
a positive
Basic price with VAT:
Discount price:
Price: $790.00
A discount:

Didn't find the desired project on the pages of our online store? Write to us at info@proekt.sx We will promptly select a ready-made project for you from our database of finished projects!!!


The design stage plays a significant role in the construction of modern administrative buildings. The architectural solution of buildings of this type must be both original and modern, distinguished by simple forms and unsurpassed design. The safety, aesthetics, and comfort of the building depend on the correct design solution. In the design process, a significant place is occupied by such factors as: the location of the building in the city system, a rational planning solution, the availability of utilities, elevators and fire extinguishing systems. Administrative buildings are classified according to the types of organizations and institutions of government to which they are assigned: ministries, regional and district state administrations; office buildings, so-called "offices". Administrative buildings, due to their functions, variety of figurative solutions and absolute size (construction volume and number of floors), significantly affect the architectural appearance of urban centers. Due to the spatial composition and placement in urban areas, administrative buildings and complexes can play the role of a dominant and serve as a landmark of the most important ensemble on a street or square. For the town-planning significance of the buildings of management activities are divided into:

- city-forming;

- serving.

As part of administrative buildings, there are groups of such premises:

1. Main purpose (common workrooms and rooms intended for employees and offices of heads of institutions and large departments);

2. Auxiliary purposes (archives, libraries, conference rooms, copying services, inspections, etc.);

3. Serving purposes (entrance nodes, medical centers, premises of catering establishments, sanitary facilities, etc.);

4. Technical premises (designed for the engineering equipment of the building: switchboards, heating points, ventilation chambers, etc.);

5. Communication premises (elevator shafts, engine rooms, stairwells, corridors, halls, etc.)

The planning decision is made rigid or plastic. A compact, geometrically balanced plan with a central core of rigidity is optimal for constructive thinking for high-rise buildings.

Authorization