Stream diversion project

https://proekt.sx

Online store for reuse projects

Cart is empty

Did not you find what you were looking for? Ask us! We have archives of 140 TB. We have all modern reuse projects and renovation projects for Soviet standard buildings. Write to us: info@proekt.sx


Stream diversion project

Base price with VAT
Discount price
Price $290.00
Discount
Price $290.00
Index: 37.145.216
Data Sheet: Project documentation including estimates
Sections: all sections
Data volume: 214 MB
File Format: editable formats
Expert opinion: a positive
Project documentation, including estimates, for the transfer of the stream bed beyond the boundaries of the industrial zone

Technical and economic indicators
Plot area, ha: 4,779
The length of the new stream bed, m .: 1770,0
Estimated cost at the 2001 base price level (without VAT)
Total: thousand rubles: 5609,74
Construction and installation works thousand rubles: 3513,75
Other expenses, thousand rubles: 2095,99
including:
PIR, thousand rubles: 437,99
refundable amounts, thousand rubles: 76,91
Estimated cost at the current price level as of December 2009 (including VAT)
Total: thousand rubles: 34638,40
Construction and installation works, thousand rubles: 23286,96
Other expenses, thousand rubles: 11351,44
including:
PIR, thousand rubles: 1586,81
VAT, thousand rubles: 3850,75
refundable amounts, thousand rubles: 378,27

Main design decisions

The newly arranged canal is carried out in an earthen bed with fastening of the bottom and slopes with geosynthetic materials - a geogrid filled with crushed stone and a non-woven needle-punched fabric. In cross section, the finished channel is a trapezoid. The coefficient of laying slopes in loamy soils is taken equal to 1,75. The route of the new stream bed, running parallel to the northern border of the site allocated for the construction of an industrial facility, crosses the future route, turns south (along the route from picket 0 to picket 9 + 50) and again flows into the old channel. The condition of observance of the distance from the outer edge of the cuvette is set tracks at least 5 m to the edge of the new stream bed (in the area of ​​PK5 + 00 - PK6 + 30 and PK7 + 50 - PK9 + 00). Appropriate adjustment of the project was made, and the corrected version was approved. To ensure the construction of the future route on the stream from picket 10 + 60 to picket 11 + 20, it is planned to install a temporary metal corrugated pipe-crossing with a diameter of 1,5 m and a length of 60 m. The new channel is being laid by excavators in a pioneering way without temporary dumps, with the transport of soil to the landfill by licensed organizations. The construction will be carried out from the mouth of the new channel, moving upstream, thus ensuring the discharge of ground and surface water into the existing stream bed downstream. Prior to the commencement of excavation works, a summary of the forest is carried out along the new route on an area of ​​4,8 hectares. After connecting the channel at the source to the existing channel, the old stream channel will be blocked by an earthen dam, and the water will be redirected to the new channel in such a way that during construction, water will flow along the existing stream channel until the new channel is finally ready, and only after that the water flow will be redirected .

Authorization